ORD RIVER EXPANSION PROJECT
Client: LandCorp
Goomig Farmlands, WA
Year: Completed 2016
The Ord River Irrigation Area (ORIA) expansion increased the irrigated area from 14,000ha to 22,000ha and required the construction of 40 kilometres of sealed roads and drainage channels by the Leighton – Moonamang Joint Venture (MJV).
WML were engaged to locate suitable basecourse material and provide pavement and bituminous surfacing advice as required. The repair history of the existing roads indicates construction of enduring pavements on black soils is challenging. Additionally, the local, naturally occurring lateritic gravels are gap graded with soft stone.
WML Consulting Services included
-
Mechanical stabilisation design for basecourse layer.
-
Management of basecourse stockpiling.
-
Evaluation of sandstone deposit for select subgrade and sub base layers.
-
Cement stabilisation design for sub base layer.
-
Bituminous surfacing advice as required.
-
The provision of surveillance officer services for pavement construction.
-
Management of basecourse pit rehabilitation.