ARMADALE ROAD NORTH LAKE ROAD BRIDGE PROJECT
Client: Main Roads Western Australia
Project Value: $259m
Year: 2018 – 2021
![Civil_header](https://wml.com.au/wp-content/uploads/2023/07/Civil_header.png)
![structural_header](https://wml.com.au/wp-content/uploads/2023/07/structural_header.png)
![geotechnical_header](https://wml.com.au/wp-content/uploads/2023/07/geotechnical_header.png)
![pavements_header](https://wml.com.au/wp-content/uploads/2023/07/pavements_header.png)
![subdivisions_header](https://wml.com.au/wp-content/uploads/2023/07/subdivisions_header.png)
WML completed the pavement and surfacing design for this major MRWA project in the Perth Metropolitan Region.
The project is situated in a busy, high-traffic environment and primarily consisted of the design of Full Depth Asphalt Pavements. WML was also retained to provide ongoing construction support throughout the entire construction timeline.
![ARNLR1](https://wml.com.au/wp-content/uploads/2023/09/ARNLR1.jpg)
![ARNLR2](https://wml.com.au/wp-content/uploads/2023/09/ARNLR2.jpg)
![ARNLR3](https://wml.com.au/wp-content/uploads/2023/09/ARNLR3.jpg)
![ARNLR4](https://wml.com.au/wp-content/uploads/2023/09/ARNLR4.jpg)