by admin | Aug 11, 2023 | Civil, Geotechnical
FORREST HIGHWAY SERVICE CENTRES Client: Perkins Builders Pinjarra, WA The project had a number of challenges during the design stage due to the flat terrain creating problems with generating grade on the ramps for drainage purposes. This was overcome with a unique...
by admin | Aug 11, 2023 | Civil, Geotechnical, Road
SOUTH WESTERN HIGHWAY THOMPSON HILL SECTION REALIGNMENT Client: Main Roads WA – South West Region Thompson Hill, WA WML was engaged by MRWA-SWR to design the re-alignment of a section of the South Western Highway referred to as the Thompson Hill section. This...
by admin | Aug 11, 2023 | Geotechnical, Industrial, Mining, Water
WHIM CREEK COPPER MINE (ENVIRONMENTAL POND REMEDIATION) Client: ANAX Metals Pilbara, WA Year: 2022 WML were engaged by ANAX metals to undertake a geotechnical investigation and provide Construction Quality Assurance for the remediation of an environmental pond for a...
by admin | Aug 11, 2023 | Civil, Geotechnical, Industrial, Mining
LYNAS CRACKING AND LEACHING PIT Client: CPC Project Design PTY LTD Mt Weld, WA Year: 2022 – 2024 Lynas Rare Earths is a producer of rare earth materials and is the world’s only significant producer of separated rare earth materials outside of China. The Lynas Mt...
by admin | Aug 11, 2023 | Geotechnical, Pavements, Road, Structural
MITCHELL FREEWAY VINCENT STREET INTERSECTION RETAINING WALL DESIGN Client: Main Roads WA WA Year: 2021 WML provided a solution which met all requirements whilst also achieving a design life of 100 years. WML was engaged by Main Roads Western Australia to undertake the...
by admin | Jul 18, 2023 | Geotechnical, Mining, Water
NEW TAILINGS DISPOSAL CELL Client: Millennium Chemicals Kemerton, WA Year: Completed 2016 Investigation of the existing Dalyellup site revealed the tailings to behave as a stiff, fissured over-consolidated clay within 12 months of deposition. The effect of solar...