by admin | Aug 11, 2023 | Civil, Geotechnical
FORREST HIGHWAY SERVICE CENTRES Client: Perkins Builders Pinjarra, WA The project had a number of challenges during the design stage due to the flat terrain creating problems with generating grade on the ramps for drainage purposes. This was overcome with a unique...
by admin | Aug 11, 2023 | Civil, Geotechnical, Road
SOUTH WESTERN HIGHWAY THOMPSON HILL SECTION REALIGNMENT Client: Main Roads WA – South West Region Thompson Hill, WA WML was engaged by MRWA-SWR to design the re-alignment of a section of the South Western Highway referred to as the Thompson Hill section. This...
by admin | Aug 11, 2023 | Civil, Road
SOUTH WEST FREEWAY PLANNING STUDY Client: Main Roads WA Busselton, WA Several access strategies and intersection options were identified, each with their impacts and restrictions, which will form part of MRWA’s multi-criteria assessment process to determine the most...
by admin | Aug 11, 2023 | Civil, Pavements, Road
BUNBURY OUTER RING ROAD Client: Main Roads WA Bunbury, WA Year: 2020 – 2025 (expected) WML was engaged as the lead pavement designer for a landmark project located in the South West. The project includes the construction of 27 km of dual carriageway highway with...
by admin | Aug 11, 2023 | Civil, Geotechnical, Industrial, Mining
LYNAS CRACKING AND LEACHING PIT Client: CPC Project Design PTY LTD Mt Weld, WA Year: 2022 – 2024 Lynas Rare Earths is a producer of rare earth materials and is the world’s only significant producer of separated rare earth materials outside of China. The Lynas Mt...
by admin | Jul 18, 2023 | Civil, Pavements, Road
SOUTH WESTERN HIGHWAY COLLIE RIVER BRIDGE DUPLICATION Client: Main Roads WA Burekup, WA Year: Completed 2017 The re-alignment of the existing road in the Raymond Road intersection area required some intricate engineering details to incorporate existing underground...