Water Corporation South West Region
Harvey North Boundary Drain Option Study
PROJECT DESCRIPTION
The North Boundary Main Drain had suffered from scour and was threatening drainage and access infrastructure along the length of the drain. WML were engaged to provide a fee to engineer remedial works.
The scope of the works provided included design and documentation of the channel, including and not limited to:
– Visiting the site to examine the issues first hand;
– Engaging sub contractors to provide feature survey;
– Pre and post development hydraulic and hydrologic modeling and analysis;
– Construction drawings;
– Opinion of probable construction cost; and
– Design Report.
The photo below shos a proposed treatment option at Raymond Road, that was designed previously by WML.

WML SERVICES
– Waterways Engineering
– Remediation Design
– Civil Design