Argyle Diamonds Limited

Argyle Diamond Mine – Conveyors CV6 and CV7 Work Platform

WML was appointed to provide structural design, engineering documentation and a calculation package for a suspended work platform to access the underside of two existing conveyors at Rio Tinto’s Argyle Diamond Mine.

Project Description

Wide shot of WMLs structural engineering consultants work constructing an observation platform for the Argyle Diamond mine in WA.

WML was appointed to provide structural design, engineering documentation and a calculation package for a suspended work platform to access the underside of two existing conveyors at Rio Tinto’s Argyle Diamond Mine.

Careful consideration was given to the installation methodology due to constraints associated with available crane lifting capacities and existing plant and structure within the proposed work area.

Other design considerations included checking design capacities of existing structure which would attract additional loading from the new platform. The steel framed platform structure was designed to comply with A.D.M standards and specifications and the relevant Australian standards including AS 1657.

WML Services

Structural Design of Platform

Design checking existing structure

Structural Engineering drawings and specifications

Lifting Frame Design and Installation Methodology

Calculation Package

Contact Us Today

At WML Consultants, we take great pride in all of our work. From the first stages of planning and design, down to the crucial aspects of project management, our team is with you every step of the way. Our highly experienced and knowledgeable engineers are here to ensure your project is completed within your timeframe and budget.

Experience just how accessible we are. Talk to us today.

WML Consultants is a consulting engineering company specialising in road engineering, civil engineering, structural engineering, geotechnical engineering, contract administration and project management.

© 2016 WML.