08 9722 3544 info@wml.com.au
Southern Seawater Desalination Plant Summit Tank

Southern Seawater Desalination Plant Summit Tank

Water Corporation Southern Seawater Desalination Plant: Summit Tank The Harvey Summit Tank was constructed approximately 3.5km north east of Harvey. Initially there was to be one 32Ml tank on the site, with provision made for a second. Project Description WML...
Kambalda Flood Study

Kambalda Flood Study

Shire of Coolgardie Kambalda Flood Study WML was engaged by the Shire of Coolgardie to undertake the design of a new floodway outlet for the BP Dam in Kambalda West. Project Description The design was modelled in HEC-RAS and a sensitivity analysis completed to...
Harvey Summit Tank 2

Harvey Summit Tank 2

Water Corporation Harvey Summit Tank 2 WML was engaged initially by Water Corporation to provide an independent assessment of rock levels encountered during construction of the second Harvey Summit Tank. WML Fee $315,00 Project Description WML was engaged...
Ground Investigation for Proposed Coal Storage Shed

Ground Investigation for Proposed Coal Storage Shed

Iluka Resources Ground Investigation for Proposed Coal Storage Shed WML was engaged by Bunge Australia undertake the design of the foundations and civil works for their proposed grain terminal, at Berth 5, within the Bunbury Inner Harbour. Project Value $18m...
Berth 5 WAPRES Ship Loader Ground Investigation

Berth 5 WAPRES Ship Loader Ground Investigation

WAVE Berth 5 WAPRES Ship Loader Ground Investigation WML was engaged by Bunge Australia undertake the design of the foundations and civil works for their proposed grain terminal, at Berth 5, within the Bunbury Inner Harbour. WML Fee $31,000 Project...